Webinar: Optimizing Injection Molding Cycle Time Using Simulation

  • Date:Jan 06, 2021
  • Location: Americas
  • Time: 2:30 PM EST

2:30 PM EST | Wednesday, January 6, 2021 | Check Your Time

Reducing injection molding cycle time is crucial concern for manufacturer as it can maximize the efficiency of production capacity and the cost. There are three stages that can be optimized: filling, packing, and cooling stage. Filling time could be optimized from pressure U-curve plot. While in the packing stage, checking the gate freeze time is the crucial part. In most of the case, applying conformal cooling is the effective method to reduce the cooling time. Learn more about how Moldex3D can reduce the cycle time in each process of injection molding!

 

 

Don’t Miss Our Upcoming Webinars!

DATETIMEZONETOPIC
2022/05/112:30 PM EDTShrinkage and Warpage, Cause and Solution
2022/05/252:30 PM EDTUnderstanding Shear Stress & Shear Rate as a Simulation Output

Test drive Moldex3D

Join the thousands of companies using Moldex3D

Talk to Sales

Schedule a product demo with our sales team